To schedule a report, click on the Type list on the left-hand side of the screen, as shown below:
tab and select the report you want to run from theNext, you are given the option to configure the following parameters of the report:
When you have configured these parameters, click on the button, as shown below:
A new window will open, where you can set the scheduling parameters of the report: